Looking for a milestone inspection in Havana, FL? Describe your project once and up to three licensed engineers and architects who work in Havana and Gadsden County get back to you with a quote. It's free and there is no obligation.
Havana is home to about 1,756 people (2024 Census Bureau estimate), a stable community (+0.1% since 2020). With 630 people per sq mi, it is a semi-rural area. Condominium and cooperative buildings of three stories or more here must go through milestone inspections as they age.
Havana at a glance
- Population (Census Bureau estimate, 2024)
- 1,756 (+0.1% since 2020)
- Rank in Florida
- 305th of 411 cities and towns
- Land area
- 2.8 sq mi
- Population density
- 630 people per sq mi (semi-rural)
- Type
- Town (Havana town)
- Main county
- Gadsden County
What to check before hiring in Havana
- License: milestone inspections are signed by a Florida-licensed architect or engineer.
- Deadline: the notice from the building official sets the deadline for phase 1; plan early, demand is high.
- Scope: compare proposals on what is inspected, testing included, and the reporting to the board and the building official.
- Reserve study: ask whether the firm also prepares the structural integrity reserve study.
Useful official resources
-
Florida Statutes, section 553.899
The law on milestone inspections.
-
Florida Building Commission
Building codes and rules in Florida.
Services available in Havana
-
Milestone inspection, phase 1
Visual examination of the habitable and non-habitable areas of the building by a licensed architect or engineer, with the report to the building official.
-
Milestone inspection, phase 2
Detailed inspection and testing when phase 1 finds substantial structural deterioration, with repair recommendations.
-
Structural integrity reserve study
Study of the structural components the association must fund, required for many Florida condominiums.
Frequently asked questions in Havana
How much does a milestone inspection cost in Havana, FL?
It depends on the size, height and condition of the building and the testing needed. Describe your building: firms who serve Havana send a proposal.
How long does phase 1 take?
From a few weeks to a few months for a large building, including the report.
Is a reserve study the same thing?
No. The milestone inspection checks the structure; the structural integrity reserve study plans the funding of its repair and replacement.
Which licensed engineers and architects will contact me?
Up to three independent licensed engineers and architects who serve Havana and the surrounding area, chosen for the service you need. Your details are shared only with your consent.
Source: U.S. Census Bureau, Population Estimates Program (Vintage 2024) and Gazetteer Files (public domain), imported on 10/31/2026. Figures describe the incorporated place or county as published; they are shown for information only.